Strategic Land Development
Y GROUP provides strategic land and ready-to-use clean utilities to empower next-generation data centers in Thailand's EEC
0+
Water Supply (Cu.m/day)
Reclaimed system secured
0+
Grid connected (MWp)
50 MWp+ scalable to 200 MWp
0
Land Development (ha)
150 ha+ scalable to 300 ha
0K
Carbon Emission* (tCO2e/y)
based on Thailands grid emission factor of 0.399 tCOe per MWh.
Power Infrastructure
On-site Solar Farm 50100 MWp with BESS 200 MWh
Water & Cooling System
Reclaimed Water Plant co-developed with YSSP Aggregate
Digital Connectivity
Technical Manager
LCB SITE
Laem Chabang
The Laem Chabang Site has been fully surveyed and assessed for data center development.
Land conditions, elevation, drainage systems, and major infrastructure connections have been thoroughly verified confirming readiness for master planning and phased construction to commence immediately.
Comprehensive physical and technical assessments have been completed,
ensuring full readiness for Hyperscale Data Center development